Testing an Artificial Intelligence-Based Boiler Filter System Control Process

Project Timeline

September 1, 2023 – May 1, 2024

Testing of a control system for an electrostatic soot removal device (filter) with self-adjusting digital control and feedback using machine learning. The device is adjusted for use in heating systems equipped with 1–10 MW combustion devices. Precise filter control ensures a soot removal efficiency of over 90%.